A fire door across a busy delivery route can become a daily frustration. Staff need to move stock, trolleys keep arriving and the door seems to close just when someone needs to pass through. You may be wondering whether there is a practical way to keep it open during trading hours without compromising its protective role. IECC can help Sydney building managers assess passive fire protection concerns and understand what must be considered before changing how a fire door operates.
An appropriately designed hold-open arrangement may be possible, but a wedge or disconnected closer is not an acceptable alternative. The door assembly, its location and the building's fire safety design all influence whether a device can be installed. Understanding how automatic release works and what happens after release will help you compare proposals and address the traffic problem without compromising fire separation.
A fire door forms part of a protective barrier, not simply a convenient entrance between rooms. When it is held open, the doorway creates an opening through that barrier. Any arrangement that keeps it open must therefore account for how it returns to its required closed position.
One consideration is whether the complete arrangement preserves the door's intended function under the conditions established for the building. A professionally installed device is not automatically suitable just because it looks permanent or operates reliably during normal business hours.
Fire-resisting walls and doors work together to separate parts of a building. A door left open can allow fire and smoke to move through an opening that the surrounding construction was intended to protect. Its everyday convenience does not change that protective role.
A functioning door closer helps the leaf return to the frame after normal passage. Where self-latching is required, the door must also complete that action. Holding the leaf away from the frame prevents these functions from operating until the restraint is removed.
That is why a plan based on someone remembering to remove a wedge is unreliable. The person who placed it may leave, become occupied elsewhere or be unable to reach the doorway when circumstances change. Staff awareness is useful, but it cannot replace a designed arrangement.
Understanding how passive fire protection helps contain fires also explains why an apparently minor change to one door can affect the protection provided by a much larger wall or compartment.
An improvised prop physically prevents a door from closing without providing a designed response to a fire signal. The same problem applies when furniture restrains a door or its closer is disconnected to make passage easier. These approaches remove a protective function rather than manage it.
A designed hold-open arrangement retains the door during permitted normal operation and releases it under specified conditions. Electromagnetic hold-open devices, for example, can use an electrically powered magnet to retain a door against its closing force. When the designated release signal is received, the magnet releases the door so it can operate closer.
This is different from a fire-activated retaining device that locks a fire door shut during a fire. Fire and Rescue NSW has raised concerns about supplementary devices that can make fire doors inoperable and interfere with evacuation or firefighter access. A suitable hold-open arrangement must allow the door to remain functional and openable when required.
The suitability of any device depends on the door assembly, its location and the building's fire safety design. Existing installations also need supporting information and appropriate inspection. If your team cannot establish why a door is held open or how it releases, arrange a professional assessment rather than assuming an older installation is acceptable.
A busy doorway is a reason to investigate available options, not proof that a hold-open device is suitable. The assessment must consider the physical door assembly and the requirements governing its operation within the building.
A proposal should explain why the arrangement is appropriate for that specific opening. A product description alone cannot establish compatibility or define the release response required for your building.
The starting point is identifying what is already installed. Relevant details include the door leaf, frame, closer, hinges, latch and any existing seals or associated hardware. For paired doors, the relationship between the leaves may also affect how they close correctly.
A specialist must determine whether the proposed device and installation are compatible with the assembly's documented requirements. Attaching hardware or changing how a door operates is not automatically acceptable simply because a component is advertised as suitable for fire doors.
The existing condition matters too. Damage, dragging, poor alignment or unreliable latching should not be overlooked when considering a hold-open arrangement. A door that already struggles to close needs its faults assessed rather than having a retaining device treated as the main solution.
Gather available door schedules, maintenance reports and records of previous alterations. Provide photographs and explain the traffic problem, but leave technical suitability and hardware modifications to professionals. Missing records may mean further investigation is necessary before a recommendation can be made.
A hold-open device that suits one building may not be appropriate for another. The door's location, the areas it separates and the documented fire safety design all influence whether holding it open is acceptable. Any applicable project-specific fire engineering documentation also needs consideration.
The assessment should establish which signals require release, what should happen under relevant fault conditions and how the arrangement interacts with existing systems. These decisions need input from the professionals responsible for the design and system interfaces, rather than an informal preference for easier access.
For buildings with complex or performance-based arrangements, the relationship between passive fire protection and building design is relevant. A change that appears limited to one door may affect an assumption in the broader fire safety design.
When comparing suppliers, ask what documentation they need and who will confirm the proposed arrangement's suitability. A clear response should distinguish the door hardware assessment from any required fire system or electrical assessment. It should also identify unresolved questions before equipment is selected or installation is scheduled.
A fire door hold-open arrangement involves several functions that must work together. The retaining device keeps the door in a permitted open position during normal use, the release mechanism responds to the required signals and the door closer returns the leaf to its required closed position.
Each function needs to be assessed independently. A holder that releases reliably is not sufficient if it receives the wrong signals, and correct release signals achieve little if the door cannot close afterwards.

Depending on the assessed design, an arrangement may use a separate electromagnetic retaining device or a suitable integrated assembly. Its purpose is to manage the open position without relying on a wedge, stock trolley, or staff member to defeat the closer.
An electromagnetic hold-open device typically uses a magnet to retain the door against its closing force. When the electrical supply or designated control signal is interrupted, the magnet releases the leaf. The closer can then return the door towards the frame.
Selection should account for the door's geometry, expected traffic and permitted holding position. The open leaf must not obstruct nearby access routes or interfere with the intended use of adjoining spaces. Review these considerations alongside the door's fire separation role.
The operating arrangement should also be clear to staff. They need to know what normal operation looks like, whom to contact if the door behaves differently and why an improvised restraint must not be added if the device stops working.
A good proposal should explain how the door operates during normal business hours, what happens after release and how the arrangement returns to service under its documented procedure. Avoid proposals that describe convenience features but leave the protective response unexplained.
Automatic fire door release means the retaining function responds to the inputs specified by the assessed design. These may include relevant fire detection or alarm signals and defined power or system fault conditions. The exact response cannot be assumed from the device's appearance or a general product claim.
Do not assume that every alarm throughout a building triggers every holder or that every fault produces the same response. The required cause-and-effect relationship must be established for the installation.
Where loss of power is intended to release a device, the complete arrangement still needs assessment. The expected behaviour must be confirmed for the actual equipment and system configuration rather than assumed from one component.
Release logic, electrical connections and integration with existing fire systems should be handled by specialists and licensed electrical professionals where electrical work is involved. These are not adjustments for building occupants to make.
Ask who will verify the completed arrangement and what records will demonstrate its operation. The work scope should identify responsibility for checking the release response and the physical door action, including any interfaces outside the door hardware contractor's work.
Release only removes the restraint holding the door open. It does not guarantee that the leaf will travel back to the frame, close in the correct sequence or latch where required.
A useful assessment considers the complete closing action. It should also account for the conditions the doorway experiences during normal trading rather than looking only at an empty corridor during a quiet inspection.
The closer needs to perform its intended role with the actual door and associated hardware. Worn hinges, a damaged frame, misalignment or an unsuitable hardware combination can prevent successful closing even when the holder releases correctly.
Latching requires separate attention where it forms part of the required operation. A door that appears almost closed may not have completed its protective function. Equally, a door that slams is not evidence of a correctly operating assembly and should not be accepted as the price of reliable closing.
Paired doors can introduce additional considerations. Their leaves may need to close in a sequence for the assembly to function as intended. A proposal must address this interaction rather than treating each leaf as an unrelated single door.
Do not attempt to improve performance by adjusting closers, removing seals or modifying latching hardware yourself. Report the symptoms and have an expert assess the cause. The proper response depends on the assembly and its documented requirements, not simply on making the leaf move more freely.
A mechanically sound door can still fail to close if a trolley, display or stored carton enters its swing path. This is relevant where the open leaf creates a space that staff start treating as storage.
Your operational review should consider where goods wait, where trolleys are parked and whether temporary displays change during busy periods. Keep the required closing path clear and ensure staff understand that an automatically released door must be able to move without someone first clearing stock. Where the doorway forms part of an exit route, keeping fire exits and exit doors unobstructed is also a fire safety compliance responsibility.
Air pressure differences, ventilation conditions and changes around the doorway may also affect closing behaviour. Tell the assessing specialist if the door behaves differently at certain times or when nearby doors are open. These observations can identify conditions that a brief inspection might miss.
Routine passive fire compliance checks help building managers recognise issues that warrant specialist attention. They do not replace the assessment and testing required for a proposed alteration.
Building managers also need to consider the applicable inspection and maintenance requirements for essential fire safety measures. From 13 February 2026, AS 1851-2012 became mandatory under the NSW fire safety regulatory framework for new and existing Class 1b and Class 2 to Class 9 buildings, subject to the applicable requirements and any relevant performance solution.
The standard covers routine servicing of fire protection systems and equipment. Building owners are responsible for ensuring that applicable essential fire safety measures are inspected, tested and maintained in accordance with the required standard. Relevant inspection and maintenance records must also be retained.
For a commercial building, the Fire Safety Schedule and Annual Fire Safety Statement identify the essential fire safety measures and their nominated standards of performance. Building managers should confirm which requirements apply to their particular door and associated systems rather than assuming every component is covered in the same way.
After installation or remedial work, request the relevant verification records and ongoing inspection requirements. Staff reporting should also remain part of everyday operations, particularly after impacts, fitout changes or repeated problems with a door failing to reach its required closed position.
Repeated propping often signals a mismatch between how a space is used and how people or goods move through it. Removing the prop addresses the immediate obstruction, but the operational pressure remains unless someone examines the underlying traffic pattern.
That does not mean every busy opening needs a hold-open arrangement. Sometimes a change to delivery timing, stock handling or the use of existing approved routes can reduce the conflict without changing the door's operation.
Start by documenting when the problem occurs. A doorway used comfortably for most of the day may become difficult during a short delivery window. Another may experience constant two-way movement because stock is stored on the opposite side from the area it serves.

Record the type of traffic as well as its frequency. Large loads, several trolley trips and staff trying to pass in opposite directions create different demands. Give this information to the building team and assessing specialist so recommendations reflect actual use.
Ask whether deliveries can be scheduled to reduce congestion or whether goods can be prepared differently before movement begins. A suitable receiving area may reduce the time spent organising stock at the opening, provided its use does not obstruct the doorway, required access or the door's closing path.
Avoid informal solutions that transfer the problem elsewhere. Parking deliveries besides another fire door, obstructing a corridor or directing people through an unsuitable route does not resolve the original issue. Any route review should remain within the building's established arrangements unless a design review supports a change.
If professional assessment rules out a hold-open arrangement, ask for the reason in terms your operations team can understand. The constraint may relate to the door assembly, the building's fire strategy or an unresolved system interface. Understanding it helps you avoid repeatedly seeking the same unsuitable solution.
You can then review practical options with the building manager, tenants and delivery coordinators. These might include spreading delivery times, reducing unnecessary trips or using an existing suitable route that is already approved for the activity. None should rely on restraining the door or changing its hardware informally.
Where the operational problem cannot be resolved within current arrangements, a broader design assessment may be needed. Changes to an opening, fire separation or egress arrangements require input before work proceeds.
Make responsibility for everyday doorway management explicit. Delivery contractors and temporary staff also need to understand the arrangement if they are accustomed to propping doors elsewhere. Give them a clear contact for access difficulties so an inconvenient door is reported rather than quietly wedged open again.
Start with a specialist who can examine the door's passive fire role, not just offer a device that keeps it open. The assessment may then require input from door hardware specialists, fire system specialists and electrical experts, depending on the proposed arrangement.
IECC provides passive fire protection services and can help building managers identify concerns affecting existing fire protection arrangements. The scope of any proposed work should make clear which parts it covers and which interfaces require specialist involvement.
Before requesting a quote, assemble the information you already have. This may include the door's location, available identification details, maintenance history and relevant drawings or fire safety documentation. Explain when the traffic problem occurs and whether the door currently closes reliably.
You do not need to resolve technical questions yourself. The purpose of providing this material is to help the assessor understand the opening and identify missing information. An assessment may require further document review or inspection before a suitable option can be confirmed.
If you are comparing passive fire protection in Sydney, clarify the passive fire assessment required before the door's operation changes. This should establish what needs checking rather than presume a hold-open arrangement will be appropriate.
A useful assessment explains the door's role, its current condition and the constraints on modification. It should distinguish necessary repairs from any proposed convenience improvement, so you can see what work is required regardless of whether a retaining device is selected.
Where a hold-open arrangement is suitable, responsibility must be clear across the whole installation. One specialist may assess the door assembly while others address electrical work, fire signal interfaces or project-specific design requirements. Do not assume a passive fire protection scope automatically includes every associated control or connection.
Ask who is responsible for confirming hardware compatibility, defining the release requirements and verifying the integrated response. Relevant electrical work should be undertaken by electrical experts, with fire system integration addressed by specialists.
Comparable proposals should describe these responsibilities, exclusions and handover information. A cheaper-looking quotation may simply omit an interface assessment, necessary remedial work or verification of the completed arrangement. Compare what is actually included rather than treating all hold-open proposals as equivalent.
The handover should leave your building team with a documented operating arrangement, relevant test and inspection records and clear maintenance responsibilities. Any applicable asset or door records should also reflect the change. Staff then need instructions on normal operation, fault reporting and whom to contact if the door releases unexpectedly or no longer closes as required. IECC assesses the passive fire protection considerations and identifies issues that need further attention. A suitable hold-open arrangement should never come at the expense of the door's protective function.